NexGen Announces Upsized C$224 Million CDI Offering in Australia CNW Group
Market data is delayed by at least 15 minutes.
    Latest Story Top Stories on NXE
    NexGen Announces Discovery of New Intense Mineralization in Greenfields Discovery 3.5 Kilometers from Arrow
    6:30a ET March 11 '24 PR Newswire

    NexGen Energy Ltd. ("NexGen" or the "Company") (TSX: NXE) (NYSE: NXE) (ASX: NXG)is pleased to announce the discovery of new intense uranium mineralization on its 100% owned SW2 Property, 3.5 kilometers (km) east of NexGen's world-class Arrow Deposit (Figure 1). The new mineralized occurrence in RK-24-183 is located on a previously untested conductor segment of Patterson Corridor East ("PCE"). Localized uranium mineralization was intersected for 19.8 meters (m) between 347.7 and 367.5 m, with peaks up to >61,000 counts per second (cps)*. Exploration is predominantly open in all directions including over 1.5 km along strike (Figures 2 and 3).

    Leigh Curyer, Chief Executive Officer, commented: "Ten years after the discovery of our world-class Arrow deposit, we are thrilled to be sharing this exciting news. This new intercept reflects the high potential of NexGen's extensive land package in the south-western section of the Athabasca Basin, Saskatchewan and is a testament to the strategic and disciplined approach to identifying new Arrow-type zones of mineralization. Drilling activity is being fully dedicated to this new discovery area to advance our understanding of scope and scale of mineralization. This hole which intersected 3.0 m of up to 61,000 cps is significantly better on all metrics than RK-14-21(the Arrow discovery hole) which intersected less than 0.5 m of greater than 9,999 cps.

    "I would like to take the opportunity to congratulate and acknowledge the fine dedicated work of the NexGen geological team. Our understanding of the markers of mineralization in the region improve with every drill hole and geophysical survey,and the NexGen exploration programs of the past years have been extremely valuable in contributing to this result. Our highly prospective land position in the south-western section of the mighty Athabasca Basin is still in its infancy, and a significant amount of exploration is in front of us to fully define the extent of mineralization at this location and the balance of Rook I / SW2."

    Follow up drilling intersected anomalous features including hematite-quartz breccia, strong silicification, dravitic clay fracture fill, redox alteration, and elevated radioactivity similar to early discovery holes at Arrow in 2014 at the upper limits of that system. Kinematics indicate reverse displacement synonymous with the interpreted structural setting. Use of geological spatial relationships observed at Arrow allows for controlled vectoring of additional drill targets across the prospective hydrothermal system which spans over 1.5 km. Results to date indicate potential that extends along strike and down dip.

    The overall setting is an approximate analog for the structural controls of Arrow. The target area lies within a large gravity low coupled with a series of disjointed conductive responses. An interpreted regional, north-south cleavage plane bisects the gravity low. A cleavage plane is also interpreted to connect Arrow, South Arrow, and Camp East. Sinistral, strike-slip displacement via contractional jog was hypothesized to account for the geophysical characteristics. This movement sense compares favourably with the sinistral, strike-slip reactivation noted as a key contributor to deposit formation at Arrow.

    Semi-massive replacement by uranium mineralization is tied to brittle-ductile reactivation of steeply dipping, discrete shear zones bracketed by silicified orthogneiss. Localized semi-massive mineralization includes primary uraninite and secondary uranium minerals. Textural characteristics of mineralization and associated alteration indicate a well-developed hydrothermal system with fluid pathways provided by the structural disruption. In particular, the role of bounding silicification, mineralization style, and stacked brittle-ductile faults are analogous to features found at Arrow (Figures 4 to 7).

    Table 1: Spectrometer results to date

    Drillhole                   Unconformity Handheld Spectrometer Results (RS-125)
                                Depth (m)
    Hole ID   Azimuth Dip Total              From (m)  To (m)    Width     CPS Range
                          Depth                                  (m)
                          (m)
    RK-24-179 310     -70 462.0 138.0        141.0     141.5     0.5       !!!!500 - 1,100
                                             150.0     157.0     7.0       !!!!500 - 560
    RK-24-180 310     -70 366.0 N/A          No Significant Intersections
    RK-24-181 310     -70 573.0 115.7        191.5     192.0     0.5       !!!!500
    RK-24-182 310     -70 411.0 N/A          No Significant Intersections
    RK-24-183 310     -70 527.0 125.3        347.7     350.0     2.3       500 - 52,000
                                             350.0     351.0     1.0       !!!!500 - 1,200
                                             351.0     354.0     3.0       700 - 16,200
                                             354.0     355.0     1.0       !!!!500 - 570
                                             355.0     358.0     3.0       1,300 -
                                                                           >61,000
                                             358.0     358.8     0.8       790 - 2,100
                                             358.8     362.5     3.7       !!!!500 - 680
                                             362.5     363.0     0.5       !!!!500 - 1,070
                                             363.0     365.0     2.0       !!!!500
                                             365.0     365.5     0.5       800 - 7,700
                                             365.5     367.0     1.5       !!!!500
                                             367.0     367.5     0.5       !!!!500 - 28,000
    RK-24-184 280     -70 534.0 137.70       No Significant Intersections
    RK-24-185 310     -70 399.0 N/A          312.5     313.5     1.0       !!!!500
                                             335.0     335.5     0.5       !!!!500
    RK-24-186 310     -70 440.0 128.2        181.5     182.0     0.5       !!!!500 - 700
                                             211.0     212.0     1.0       !!!!500 - 600
    RK-24-187 310     -70 501.0 116.8        163.0     164.5     1.5       !!!!500
                                             191.0     191.5     0.5       !!!!500 - 830
    RK-24-188 310     -70 510.0 120.5        338.0     340.0     2.0       !!!!500
                                             410.5     412.5     2.0       !!!!500
                                             418.5     421.5     3.0       !!!!500
    
    • All depths and intervals are metersdownhole, true thicknesses are yet to be determined.
    • "Off-scale" refers to >61,000cps total readings by gamma spectrometer type RS-125
    • Unconformity of 'N/A' denotes a lack of visible contact between Athabasca sandstone and basement rock.
    

    About NexGen

    NexGen Energy is a Canadian company focused on delivering clean energy fuel for the future. The Company's flagship Rook I Project is being optimally developed into the largest low cost producing uranium mine globally, incorporating the most elite standards in environmental and social governance. The Rook I Project is supported by a NI 43-101 compliant Feasibility Study which outlines the elite environmental performance and industry leading economics. The Project is located in the Province of Saskatchewan, Canada - a world leading uranium producing Province expressly committed to advancing nuclear energy opportunities that sustainably promote economic growth and reduce greenhouse gas emissions.

    NexGen is led by a team of experienced uranium and mining industry professionals with expertise across the entire mining life cycle, including exploration, financing, project engineering and construction, operations, and closure.NexGen is leveraging its proven experience to deliver a Project that leads the entire mining industry socially, technically, and environmentally.NexGen's Project and prospective portfolio in northern Saskatchewanwillprovide generational long-term economic, environmental, and social benefits for Saskatchewan, Canada, and the world.

    NexGen is listed on the Toronto Stock Exchange, the New York Stock Exchange under the ticker symbol "NXE" and on the Australian Securities Exchange under the ticker symbol "NXG" providing access to global investors to participate in NexGen's mission of solving three major global challenges in decarbonization, energy security and access to power. The Company is headquartered in Vancouver, British Columbia, with its primary operations office in Saskatoon, Saskatchewan.

    Technical Disclosure*

    All technical information in this news release has been reviewed and approved byJason Craven, NexGen's Manager, Exploration, a qualified person under National Instrument 43-101.

    Natural gamma radiation in drill core reported in this news release was measured in counts per second (cps) using a Radiation Solutions Inc. RS-125 gamma spectrometer. The reader is cautioned that total count gamma readings may not be directly or uniformly related to uranium grades of the rock sample measured; they should be used only as a preliminary indication of the presence of radioactive minerals.

    A technical report in respect of the FS is filed on SEDAR (www.sedar.com) and EDGAR (www.sec.gov/edgar.shtml) and is available for review on NexGen Energy's website (www.nexgenenergy.ca).

    Cautionary Note to U.S. Investors

    This news release includes Mineral Reserves and Mineral Resources classification terms that comply with reporting standards in Canada and the Mineral Reserves and the Mineral Resources estimates are made in accordance with NI 43-101. NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. These standards differ from the requirements of the Securities and Exchange Commission ("SEC") set by the SEC's rules that are applicable to domestic United States reporting companies. Consequently, Mineral Reserves and Mineral Resources information included in this news release is not comparable to similar information that would generally be disclosed by domestic U.S. reporting companies subject to the reporting and disclosure requirements of the SEC Accordingly, information concerning mineral deposits set forth herein may not be comparable with information made public by companies that report in accordance with U.S. standards.

    Forward-Looking Information

    The information contained herein contains "forward-looking statements" within the meaning of applicable United Statessecurities laws and regulations and "forward-looking information" within the meaning of applicable Canadian securities legislation. "Forward-looking information" includes, but is not limited to, statements with respect to mineral reserve and mineral resource estimates, the 2021 Arrow Deposit, Rook I Project and estimates of uranium production, grade and long-term average uranium prices, anticipated effects of completed drill results on the Rook I Project, planned work programs, completion of further site investigations and engineering work to support basic engineering of the project and expected outcomes. Generally, but not always, forward-looking information and statements can be identified by the use of words such as "plans", "expects", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", or "believes" or the negative connotation thereof or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved" or the negative connotation thereof.Statements relating to "mineral resources" are deemed to be forward-looking information, as they involve the implied assessment that, based on certain estimates and assumptions, the mineral resources described can be profitably produced in the future.

    Forward-looking information and statements are based on the then current expectations, beliefs, assumptions, estimates and forecasts about NexGen's business and the industry and markets in which it operates. Forward-looking information and statements are made based upon numerous assumptions, including among others, that the mineral reserve and resources estimates and the key assumptions and parameters on which such estimates are based are as set out in this news release and the technical report for the property , the results of planned exploration activities are as anticipated, the price and market supply of uranium, the cost of planned exploration activities, that financing will be available if and when needed and on reasonable terms, that third party contractors, equipment, supplies and governmental and other approvals required to conduct NexGen's planned exploration activities will be available on reasonable terms and in a timely manner and that general business and economic conditions will not change in a material adverse manner. Although the assumptions made by the Company in providing forward looking information or making forward looking statements are considered reasonable by management at the time, there can be no assurance that such assumptions will prove to be accurate in the future.

    Forward-looking information and statements also involve known and unknown risks and uncertainties and other factors, which may cause actual results, performances and achievements of NexGen to differ materially from any projections of results, performances and achievements of NexGen expressed or implied by such forward-looking information or statements, including, among others, the existence of negative operating cash flow and dependence on third party financing, uncertainty of the availability of additional financing, the risk that pending assay results will not confirm previously announced preliminary results, conclusions of economic valuations, the risk that actual results of exploration activities will be different than anticipated, the cost of labour, equipment or materials will increase more than expected, that the future price of uranium will decline or otherwise not rise to an economic level, the appeal of alternate sources of energy to uranium-produced energy, that the Canadian dollar will strengthen against the U.S. dollar, that mineral resources and reserves are not as estimated, that actual costs or actual results of reclamation activities are greater than expected, that changes in project parameters and plans continue to be refined and may result in increased costs, of unexpected variations in mineral resources and reserves, grade or recovery rates or other risks generally associated with mining, unanticipated delays in obtaining governmental, regulatory or First Nations approvals, risks related to First Nations title and consultation, reliance upon key management and other personnel, deficiencies in the Company's title to its properties, uninsurable risks, failure to manage conflicts of interest, failure to obtain or maintain required permits and licences, risks related to changes in laws, regulations, policy and public perception, as well as those factors or other risks as more fully described in NexGen's Annual Information Form dated February 24, 2023 filed with the securities commissions of all of the provinces ofCanadaexceptQuebecand in NexGen's 40-F filed with the United States Securities and Exchange Commission, which are available on SEDAR atwww.sedar.comand Edgar atwww.sec.gov.

    Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking information or statements or implied by forward-looking information or statements, there may be other factors that cause results not to be as anticipated, estimated or intended. Readers are cautioned not to place undue reliance on forward-looking information or statements due to the inherent uncertainty thereof.

    There can be no assurance that forward-looking information and statements will prove to be accurate, as actual results and future events could differ materially from those anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking statements or information. The Company undertakes no obligation to update or reissue forward-looking information as a result of new information or events except as required by applicable securities laws.

    https://c212.net/c/img/favicon.png?sn=TO57458&sd=2024-03-11

    View original content to download multimedia:https://www.prnewswire.com/news-releases/nexgen-announces-discovery-of-new-intense-mineralization-in-greenfields-discovery-3-5-kilometers-from-arrow-302085021.html

    SOURCE NexGen Energy Ltd.

    https://rt.newswire.ca/rt.gif?NewsItemId=TO57458&Transmission_Id=202403110630PR_NEWS_USPR_____TO57458&DateId=20240311

    COMTEX_449071455/1005/2024-03-11T06:30:32

    NexGen Announces C$180 Million CDI Offering in Australia
    6:45a ET April 30 '24 CNW Group
    NexGen Announces C$180 Million CDI Offering in Australia
    6:45a ET April 30 '24 PR Newswire
    Aero Energy Partners with Leading Drill Contractor for Upcoming Explo...
    7:06a ET April 3 '24 Newsfile Corp
    Global Uranium Production to Increase as Prices Are Expected to Hit a...
    8:15a ET April 2 '24 GlobeNewswire
    Aero Energy Announces Airborne VTEM(TM) Plus Survey Targeting High-Gr...
    7:36a ET March 26 '24 Newsfile Corp
    NexGen Announces Discovery of New Intense Mineralization in Greenfiel...
    6:30a ET March 11 '24 PR Newswire
    NexGen Energy to Host Year End Conference Call
    7:10a ET March 6 '24 CNW Group
    NexGen Energy to Host Year End Conference Call
    7:10a ET March 6 '24 PR Newswire
    Baselode Ready to Start Drilling at Catharsis Uranium Project
    6:03a ET February 15 '24 Newsfile Corp
    How Supply & Demand is Likely Driving the Uranium Market to Reach a 1...
    8:45a ET February 14 '24 GlobeNewswire

    Market data provided by News provided by